Skip to main content

XTM Connect – Optimizely 1.5

Starting a tree content synchronization manually (Optimizely 12)

Regardless of the scheduled tree content synchronization (for details, see Configuring XTM Schedule Tree Content Synchronization (Optimizely version 12)) you can start a tree content synchronization manually, in the XTM Schedule Tree Content Synchronization job screen, at any time.

To start a tree content synchronization manually (Optimizely 12):
  1. Log in to Optimizely.

  2. In the main panel, in the top navigation bar, select the Admin tab. Then, select the Scheduled jobs subtab. In the Scheduled jobs list, select XTM Schedule Tree Content Synchronization. Finally, in the left hand-side panel, select Details.

  3. In the Details tab screen, at the bottom, select the Start button.

Result: the tree content synchronization is started. The Status parameter, above the Start button, is changed to Running. Also, in the top right-hand corner of the screen, messages informing about the start and then a success or a failure of the synchronization process are displayed.

The next scheduled tree content synchronization will take place according to the settings made in the Settings tab.

Translation requesters can also run the tree content synchronization manually when they send content for translation. For details, see Sending content to XTM Cloud for translation.